Client Name
Modern Frameless Glass
Industry
Glass balustrade
Location
Taren Point NSW
Duration (Project Length)
6 weeks
Completion Date
09/18/2024
Products / Services Used
What was the problem / challenge we were solving in this project?
More storage – Faced with not only limited floor area, the mezzanine floor was limited by the roof height, which posed challenges in designing the floor with enough head clearance below and above the floor. In addition, there was minimal room to allow loading onto the mezzanine floor.
What was the solution?
A custom designed and built Mezzanine – AWS was able to maximise the above and below clearance by optimising the design and minimising the floor thickness. We opted for a swing gate instead of a sliding gate to meet the customers needs.
What were the results?
The customer was extremely happy with the result, and the installation team.